Lomtsi Homes

Targovishte · Bulgaria

Lomtsi

Lomtsi appears at the end of a published route from Popovo. Use the viewing to establish which work the house needs first and what can wait until after you have a usable room.

Province
Targovishte
Municipality
Popovo
Place type
Village
Bulgarian name
Ломци
Postal code
7838

The local guide

Comparing renovation phases in Lomtsi

At a house with a usable ground floor and work needed above, inspect both areas for shared roof and damp problems. Ask a contractor to separate work needed before the first winter from optional upgrades to other rooms.

Property catalogue

Homes in Lomtsi

Listings from BG House. Open the full property page for the latest price, availability and viewing options.

Map and first visit

Plan a visit to Lomtsi

The pin shows the area. Ask the seller for the exact property entrance before travelling.

Open larger mapDirections to the area

Before you buy

Living in Lomtsi

A village at the end of a Popovo route

The municipality’s transport plan lists a Popovo–Lomtsi service and shows Drinovo and Kardam on parts of the route. It’s a useful reference for organising several viewings in the area. Check current operation before planning a day by bus, and allow time to inspect the road to the individual house.

Popovo municipal transport plan, route 7

Plan work across both floors

If you hope to use the ground floor first, inspect the roof and plumbing that serve the rooms above it. Have a builder say which repairs must happen before you move in and which can wait. Compare staged costs between properties so a usable room doesn’t hide a whole-house repair.

Ask for two quotes for different stages of the renovation

Request one quote for safe services, keeping rain out and using a basic bathroom and sleeping room. Ask for a second quote for the changes you can schedule afterwards. Note which materials can be brought in together and which require a second visit from Popovo. Two quotes will help you see which later decisions affect the work you would do now.

Map and visit guide for Drinovo

A buyer’s example

Find the work upstairs that would affect your rooms downstairs

Imagine you plan to use the ground floor of a Lomtsi house while leaving the upper rooms for later. Ask how the bathroom, water supply and electricity are routed. If a room above shows signs of an old leak or the roof still needs work, photograph the corresponding area below and ask an independent surveyor what needs checking.

Have the builder identify repairs that need both floors to be open. Ask what they can complete before the downstairs rooms are usable and which future jobs would require you to clear those rooms again. That separates a genuinely workable first phase from a plan that postpones the work the rest of the house depends on.

Next steps

Arrange a viewing

If you have a property in mind, include its listing reference and your preferred viewing dates.

About this guide

Sources and publisher

Published by Nyama Problemi Ltd. BG House provides the property listings. Use the full listing to check the price and availability before arranging a viewing.